1
/
of
6
invoxia
Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months of Battery Life
Invoxia GPS Tracker PRO - Real-Time Location - No Included Subscription - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months of Battery Life
Regular price
$148.50 USD
Regular price
$148.50 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- INVOXIA GPS PRO - The Invoxia GPS Tracker Pro is the next generation tracker, offering advanced location accuracy thanks to LTE-M connectivity. High performance, with international coverage.
- LOCATION TRACKING - Offers advanced location tracking for less accessible locations (LTE-M connectivity), with histories and tracks. One-off or permanent export and location sharing functionalities.
- TRACKING 24/7 - GPS tracker for everyone, everywhere in US in real time. Quick to set up via the app. The tracker is connected to an application that allows you to track in real time.
- THEFT PREVENTION - Suspicious movement alerts, virtual zones with entry/exit alerts, be notified immediately on your smartphone in the event of attempted theft. Maximizing the chances of recovery.
- EXCEPTIONAL BATTERY LIFE - GPS tracker device for use with a smartphone, tablet or PC. The battery can last up to 6 months without charging. Position update every 30 seconds. Refillable in 90 minutes
Overview
- Brand : invoxia
- Special Feature : Wireless
- Connectivity Technology : Cellular
- Supported Application : GPS
- Specific Uses For Product : Vehicles, People
Share
